The Project Gutenberg EBook of Report on the Department of Ports and
Harbours for the Year 1890-1981, by Department of Ports and Harbours

This eBook is for the use of anyone anywhere at no cost and with
almost no restrictions whatsoever.  You may copy it, give it away or
re-use it under the terms of the Project Gutenberg License included
with this eBook or online at www.gutenberg.org


Title: Report on the Department of Ports and Harbours for the Year 1890-1891

Author: Department of Ports and Harbours

Release Date: January 27, 2008 [EBook #24442]

Language: English

Character set encoding: ISO-8859-1

*** START OF THIS PROJECT GUTENBERG EBOOK REPORT 1890-1891 ***




Produced by Nick Wall, Brisbane, Australia. <nick0252@live.com.au>





1891.

QUEENSLAND

REPORT ON THE DEPARTMENT OF PORTS AND HARBOURS

FOR THE YEAR 1890-91.

Presented to both Houses of Parliament by Command.




TO THE HONOURABLE THE COLONIAL TREASURER.

Department of Ports and Harbours,
Brisbane, 26th August, 1891.

Sir,—I have the honour to submit, for your information, the following Report concerning this Department for the past year:—

I assumed charge on the 1st July, 1890, and found that the heavy gales and floods experienced in January of the same year had most seriously affected several of the dredged cuttings of the Brisbane, Mary, Burnett, and Fitzroy Rivers. In some places the Brisbane River had silted up to such an extent that there were fully 18 inches less water than before the flood. This, however, only proved a temporary inconvenience, as the dredges soon restored the cuttings to their original depths. I also found that considerable changes had taken place in the formation of the banks at the northern entrance to Moreton Bay, necessitating the removal—to make the lead effective—of Tangaluma Light (which had only been established in 1885), also the removal (for the fourth time) of the Yellow Patch Light, and the building of two new cottages for the lightkeepers. Owing to the encroachment of the sea, it had also been found necessary to remove Comboyuro Point Lighthouse and the keeper's cottage some 200 feet further inland. This work was accomplished by the Inspector, Mr. H. L. Pethebridge. The floating beacon which marked the northern entrance to the port had been ashore on Bribie Island for some time, but, during the first interval of settled westerly weather, she was floated and brought to Brisbane to be repaired and supplied with new moorings, after which she was on the 8th August replaced in her former position, and by the end of October the works of the Department generally, which had suffered in the early portion of the year, were restored.

In January and February of the present year another series of heavy gales was experienced along the whole coast of the Colony, and on the 6th, 7th, and 8th of June a gale of unusual severity, accompanied by torrents of rain, swept along the coast from Bowen southwards, causing heavy seas and abnormally high tides. Such unfavourable weather, of course, occasioned considerable loss to the Department, a great number of buoys being driven from their moorings (some lost altogether), and beacons and other plant receiving a large amount of damage.


MORETON BAY AND BRISBANE RIVER.

The banks at the northern entrance to Moreton Bay are constantly shifting, and the maintenance of the necessary lights and buoys to enable vessels to enter and clear the port in safety is a source of continual anxiety. The floating beacon, which had broken adrift during the month of February, disappeared altogether on the 10th March; and although diligently searched for, no trace of her has been discovered. Two valuable buoys disappeared from the outer banks about the same time. The floating beacon has been replaced by a new second-class (Trinity pattern) steel conical buoy, surmounted with a staff and cage, the top of which is 12 feet above the water, forming a most conspicuous object. New buoys have been moored in the positions of those lost.

No. 1 cutting, Hamilton Reach, has now a depth of 17 feet at low water, spring tides; and the entrance to the bar cutting is being dredged to a similar depth. The increased depth of water in these cuttings is of considerable importance to vessels of heavy draught. A depth of 15 feet at low water, spring tides, is fully maintained in the other cuttings, but there are several shallow places in the town reaches of the river which require attention.

The more recent gales and floods do not appear to have injuriously affected the dredged cuttings of the Brisbane River. Several new beacons have been erected to replace those blown down or found defective; and, to render them more conspicuous, heads have been placed on some of the beacons marking the bar cutting. Beyond some slight repairs, now being effected, all the sea and river marks for the navigation of this port are in good order, and the various buildings are not likely to require any extensive repairs for some time.

The apparatus at the various lighthouses in Moreton Bay are in good order, with the exception of the reflectors at Cape Moreton, which will shortly require re-silvering. This work can be done locally.

The sea-pilot steamer "Advance" continues to do her work satisfactorily, and is most usefully employed at her present station. She is only used for towing in cases of emergency, so that her earnings in that respect are very limited.

The "Laura" is a most useful vessel, and is kept fully employed performing the various duties of the Department. She is, however, seventeen years old, and her hull shows signs of weakness, although her engines and boiler are in good order.

The "Pippo" requires a new boiler and certain repairs to her hull. To efficiently carry out the work of the Department at this port, I find a third steamer indispensable, as the "Advance" must be kept at her station, and it is impossible for the "Laura" to successfully perform all the other work of the Department; and should either break down, a third steamer would be necessary as a relieving vessel.

The Nautical Surveyor (Mr. E. A. Cullen) has just finished a survey of the northern half of Moreton Bay, a work which was rendered necessary by the fact that the only chart available for use was one originally published by the Admiralty in 1865, with corrections inserted at various intervals up to within the last two years, since which great changes have taken place in the formation of the banks. Mr. Cullen accomplished the work in the "Pippo" in a most satisfactory manner, in the short space of five months, and a tracing of the new chart has been transmitted to the Admiralty for publication. The survey discloses changes of a prejudicial character at the entrance to the North or Howe Channel, which has been contracted by the extension of the east bank in a northerly direction about four cables, and the south-east extreme of the north bank to the eastward, about three and a half cables, while to the north-north-east of the north bank a small patch has formed, having only three fathoms upon it at low water. This patch is only one cable to the westward of the line of lights, and a continuance of similar growths will render the entrance at night exceedingly difficult, and probably destroy the utility of the present leading lights. The channel, however, at present maintains a depth in its shallowest part of 21 feet at low water, spring tides. The attached plan shows the position of the line of lights in relation to the three fathom patch and north-west extreme of the east bank. The three and five fathom contours as existing in 1886 are shown in red, while their present positions are indicated in black. Numerous other changes are shown on the new chart, but the banks to the westward, in the vicinity of the north-west channel, have changed so very little during the last twenty-five years that the channel may be regarded as practically a permanent one. It is the widest, deepest, and only permanent approach to Moreton Bay, and vessels of heavy draught, whose visits are rapidly increasing—including some of H.M. ships—have now to wait for daylight to enter the port by this channel. It is buoyed for use in the daytime, and can—when considered necessary—be easily and cheaply lighted for use at night.

The approach to Moreton Bay by the South Passage should be discouraged, as the banks move about in a remarkable manner; and variation in the depth of water and direction of the channels being of frequent occurrence, it should be attempted only by men possessing good local knowledge, in vessels of light draught.


WIDE BAY AND MARYBOROUGH.

The new channel across Wide Bay Bar, which was buoyed and lighted in July of last year, maintains its depth and direction. Some changes have taken place in Sandy Strait, notably at Stewart's Island Flats, where the cutting has silted up; and a new channel to the eastward of the cutting, carrying a depth of 18 inches more water, has been beaconed and lighted. The gales and floods experienced during January and February did very great damage; and the outlay in replacing lost buoys, and repairing and replacing beacons, has been considerable. A perch buoy has been moored at the northern entrance to Great Sandy Strait, in place of the floating beacon which was sunk on the night of the 10th May last. The work of raising this vessel was commenced, but had to be abandoned in consequence of heavy weather coming on and ultimately breaking her up. The buoys and beacons are in good order throughout this district. When the cutting at Horse-shoe Bend is completed, there will be a depth of 10 feet at low water, spring tides, through all the cuttings in the Mary River, and vessels drawing 19 feet will be enabled to reach the wharves at Maryborough.

The lightkeeper's cottages at Woody Island and one of the cottages at Inskip Point require some repairs, but with those exceptions the domiciles are in good order.

The steamer "Llewellyn" has been recently surveyed, and, beyond the ordinary outlay, no expenditure is anticipated during the current year. In June last this vessel was instrumental in saving the brigantine "Hector," with eighty lives on board, from being wrecked on Breaksea Spit. In Great Sandy Strait and the Mary River there are no less than 50 lights, most of which are leading lights burning day and night. These lights keep two steam launches with their crews constantly at work attending to them; the system is elaborate, but very costly.


BURNETT RIVER.

The gales and floods in the early part of this year, and again in June last, caused considerable damage in the river and outside the Heads, nearly every buoy being swept from its moorings, by the velocity of the freshes (two being lost altogether). Several of the beacons were blown down, and the course of the channel in the Inner Bar lead altered so much, that the leading beacons had to be removed twice. The banks at the entrance to the river have increased in extent, and changed the course of the channel outside the Bar, rendering the approach to the port more intricate. The buoys have been shifted to mark the new channel.

The lighthouse at the Burnett Heads and the leading beacons in the river are all in good order. The pilot vessel has given much satisfaction since receiving extensive alterations and repairs in Brisbane last year.

The new explosives magazine is found to be a great convenience, and offers ample accommodation for all requirements.

The beacons in the Kolan River, which were blown down in the June gale have been restored.


PORT CURTIS.

The recent heavy weather has had the effect of altering very much the north channel into Port Curtis, the depth having shallowed from 18 to 11 feet at low water, spring tides. The inner end of the channel has been contracted by the extension of the north-west end of the east bank west-north-westerly direction, and the spit off Oyster Rock to the southward. These changes have necessitated the removal of the two buoys—formerly marking the entrance—to the inner edge of the east bank and the southern point of the spit off Gatcombe Head.

Heavy deposits of mud have taken place in Auckland Creek and the Calliope River, and it has been found necessary to shift the leading lights to enable vessels to enter the creek in safety. Considerable expense has been incurred through the renewals of buoys and beacons occasioned by the floods in February last, almost every buoy being displaced. All the marks are now, however, in position again. The light on Gatcombe Head and the apparent light on Oyster Rock are working satisfactorily, and the dwelling-houses of the lightkeeper and pilot crew are in very fair order, only one of them requiring repairs of any consequence. Ordinary wear and tear is the only expense likely to be required for the pilot schooner "Enid" during the current year.

Very little progress of any utility has been made in connection with the work of deepening the Narrows.

At Bustard Head I found the lighthouse, the two auxiliary lights, and the domiciles of the superintendent and keepers in excellent order.


ROCKHAMPTON.

The floods of this year have caused no changes of importance in the Fitzroy River. The new channel at Central Island—which opened out and was beaconed and lighted this time last year—maintains its depth unassisted by dredging operations, and appears to be improving. No. 5 cutting is consequently no longer used. A new vessel has replaced the old lightship at the Upper Flats. She is considered an efficient and necessary beacon at one of the most rocky curves of the Fitzroy River, and serves as a domicile for the lightkeepers, who maintain the lights ashore and afloat for a distance of five miles. Tidal signals are also shown from the vessel both day and night.

During the year the dwelling-houses of the pilot's staff at Keppel Bay and the lightkeepers at Sea Hill, Balaklava, and Brown's Crossing have been painted throughout; at the latter station some repairs were also executed. Any further expense during the current year is, therefore, not likely to be necessary.

At Balaklava the sea is encroaching on the northern foreshore of the island, but arrangements have been made to deposit some 500 tons of ballast, of which a rough dyke will be constructed by the Harbour Master's staff. This, it is anticipated, will prevent further inroads by the sea.

The buildings at Sea Hill and at the pilot station are in good order. The Timandra Bank lightship requires some repairs, and the decks want caulking, which I anticipate may be done without removing the vessel from her station. All the buoys and beacons in Keppel Bay and the Fitzroy River have had careful attention, and are in good order.


CAPE CAPRICORN.

The lightkeeper in charge of this station (Edwin Biss) died in Rockhampton during the year, and was succeeded by the first assistant (James Aitken). The lighthouse tower is in good order, but the iron roofing of two of the cottages requires renewal, being oxidised and full of perforations.


NORTH REEF.

At this exposed and isolated station I found the central structure in sound condition, but the corrugated iron forming the walls and roof of the circular superstructure round the base of the tower, and which forms the domicile for the superintendent and lightkeepers, is very much corroded by the action of the salt water, necessitating some considerable repairs. During the gale and high tides of March last, the sandbank was entirely submerged, the sea smashing in the doors and windows, and flooding the keeper's quarters. The sand, some 14 feet in depth, which originally surrounded the building, has been washed away, allowing the sea free access to the foundation caisson, which is down 14 feet into the solid madrepore. I do not, however, consider the stability of the structure is depreciated to any extent in consequence. This station, like Cape Capricorn, is visited by the Harbour Master at Rockhampton once a month.


PINE ISLET.

Everything here is in good order, and a gangway ladder has been constructed to facilitate landing at this almost inaccessible rock, which the Harbour Master at Rockhampton visits every two months.


YEPPOON.

One small steamer and two or three small craft trade to this place, the Department maintaining the necessary marks for navigation.


HARRISVILLE (EMU PARK).

No vessels except fishing and pleasure boats have been here for some time. A black buoy is, however, kept moored off the end of the outer reef.


PORT BOWEN.

Is now only visited by vessels seeking shelter. The wharf is in good order, but no cattle have been shipped since 1887.


BROADSOUND.

Since October last the staff at this port, which previously consisted of a pilot and three hands, has been considerably reduced—the coxswain only (who is also a boatman pilot) being retained. The trade to the port is merely one small steamer, making about four trips a year.


PORT MACKAY.

So far but little improvement in the Pioneer River appears to have resulted from the construction of the stone training walls. Raising the wall from Fisherman's Bank down stream to its present termination will have a beneficial effect, and remove the possibility of small vessels—when not under command—resting upon it at high water. Its additional height will also prevent the sand (as in February last, when the sea made a breach through East Point) from being carried over into the main channel and leaving a deposit of some 18 inches on the top of the wall. The upper stone wall commencing at Magazine Island has proved beneficial, by creating a scour resulting in the removal of the upper flats. At East Point the bar beacons have been removed again (for the third time in ten years), in consequence of the continual growth in a south-westerly direction of the extreme end of the sand spit.

The older portion of the wooden retaining wall on the south bank of the Pioneer River is in a most unsightly and dilapidated condition, owing to the combined ravages of white ants and cobra; the newer portion is also being quickly destroyed from the same cause. The stone retention wall which extends along part of River Street is, however, well constructed, and likely to prove of permanent utility.

The buoys and beacons within Port Mackay are in an efficient condition, and the lighthouse at Flat Top and dwelling-houses of all the Department's employees require but few repairs. The steam launch is a useful handy vessel, and is in good order.


HABANA CREEK.

To the northward of Mackay, is the outlet for all the sugar manufactured on the Habana Estate, which last year amounted to 2,666 tons. The requisite beacons are maintained by the pilot's staff at Mackay.


CABBAGE-TREE CREEK.

To the southward of Mackay, is available for small vessels drawing 8 or 9 feet of water, and may possibly require beaconing, as it is likely to be availed of, in consequence of its close proximity to Grass-Tree Mountain, where gold reefing promises shortly to be in operation.


DENT ISLAND.

As this station I found the lighting apparatus working well, and the tower and cottages in a satisfactory condition. Mr. F. Walker, the late lightkeeper in charge, has been compelled to retire through ill-health, after a faithful service of twenty-one years.


BOWEN.

I regret to say that Mr. Robert Findlater, who has satisfactorily filled the position of pilot at Bowen for the last twenty-eight years, died last month. The boatman pilot will in future carry out the duties hitherto performed by Mr. Findlater. The platform of the lighting apparatus at North Head lighthouse requires some repairs, but the other buildings appear in good order. The wreck of the s.s. "Wentworth" still remains on the rocks to the southward of North Head, and forms a most efficient beacon. The pilot ketch "Dudley" has been recently repaired at Townsville in a very satisfactory manner. She is a very useful vessel, making monthly trips to Dent Island in addition to her other duties.


CAPE BOWLING GREEN.

During the last six months the sea has gradually encroached upon the lighthouse and cottages at this station, quite 150 feet of the bank in front of the lighthouse having disappeared. The sea, on three occasions, washed some of the piles from under the superintendent's house. With high spring tides the water touches the base of the lighthouse on the north-west side; and as the spit to the south-east is now moving away, it would appear more than probable that if any further encroachment takes place the buildings will be surrounded with water, when their position will be most critical. There was nothing abnormal in the state of the tide when the greatest encroachment took place, and the disappearance of the bank which formerly protected the buildings can only be accounted for by the soft and yielding nature of the sand which underlies an apparently hard and compact surface. I visited Cape Bowling Green twice within a month, and the changes wrought during the interval of my visits were remarkable. On the first occasion a bank of sand 6 feet high, with a row of cocoanut trees about eight years old, extended some 150 feet in front of the buildings. On my last visit the whole of this bank, together with the cocoanut trees, had disappeared, and the sea at high water was washing under the superintendent's house and within a few feet of the lighthouse. I consulted on the spot with the Harbour Master (Mr. Hughes), the Inspector (Mr. Pethebridge), and the Superintendent (Mr. Cole), all of whom have been acquainted with the place for the last seventeen or eighteen years, with the object of selecting a new and more eligible site. Such, however, does not appear to exist. The lighthouse and apparatus are in good order, and the cottages, with the exception of that occupied by the superintendent, are in fair condition.


CAPE CLEVELAND.

The clockwork requires some slight alterations, owing to the irregular intervals of revolution; but, with that exception, everything is in satisfactory order.


TOWNSVILLE.

No alteration appears to have taken place in the depth of water in Cleveland Bay. The damage to the eastern breakwater caused by the cyclone of last year has been repaired, and the structure has been greatly strengthened. At its outer extremity a massive concrete foundation has been embedded in the masonry, upon which the lighthouse has been strongly secured. The light is of the 4th order dioptric, showing a red arc of 270° to seaward, and a white arc of 90°, visible inside the breakwater and to the southward towards Alligator Creek. The extension of the western breakwater is also completed, and from its outer extremity a small green light will be exhibited. The channel into Ross Creek, dredged in 1889 to a depth of 10 feet at low water, has silted up in places below the Harbours and Rivers' Wharf to 5-1/2 feet; above that it retains its depth.

Inside the breakwater, and at the entrance between the piers, dredging is being proceeded with, and it will be a great advantage to the shipping visiting the port when the dredging along the inside of the eastern breakwater is completed.

It is proposed to erect semaphores for exchanging communications between the signal station and Bay Rock lighthouse, flag signals being frequently indistinguishable. The lighthouse at Bay Rock is well maintained.

The steam launch is very useful, but rather small for the work she has to perform.

The buoys and beacons in Cleveland Bay are now in good repair, several renewals having been necessary during the past year. All the property of the Department appears to be well looked after, and in an efficient state. The new relieving lightship built at Townsville was finished last April. After being fitted with two new 5th order dioptric lights—which, being exhibited from the same lantern, show a powerful fixed light—she was towed up in July to relieve the Channel Rock lightship, which had been thirteen years at her moorings. The latter vessel has been brought to Townsville for repairs.


BARRATTA AND ALLIGATOR CREEKS.

Have required rebeaconing throughout. The trade to the latter creek is increasing, as the Meat-preserving Works have recommenced operations.


PLANTATION CREEK.

The necessary beacons and leading lights are maintained.


DUNGENESS.

At this port much damage was done by the gales in the early part of the year. The beach which formerly protected the pilot station buildings has been greatly encroached upon by the sea, and at one time fears were entertained for the safety of the dwelling-houses. Happily, however, the only damage done was the destruction of the boatshed and the loss of a few stores. The Custom-house and telegraph station, which adjoin the pilot station, are being removed to a new site; and I think it advisable that the pilot station should also be removed, as, with a renewal of last year's weather, the buildings may be lost altogether. The destruction to buoys and beacons was very great, and the approaches to the Herbert River have altered very much. All damage to buoys and beacons has been made good, and the channels, which retain their former depths, re-marked.


SNAGGING PUNT.

Snagging has been carried on during the year in the Johnstone, Seymour, Herbert, and Nind Rivers. The results, however, were not satisfactory, it being difficult to control the operations of the men. A local trust has been appointed to carry out the work, and better results may be anticipated.


MOURILYAN HARBOUR.

The trade to this port is now confined to the visit of a small steamer twice a week. The necessary beacons and lights are maintained by the Department.


JOHNSTONE RIVER.

Has, like mostly all the other ports, suffered from the effects of gales and floods. The amount of damage was, however, comparatively trifling, and confined to the blowing down of a few inexpensive beacons. The approach to the river has altered its direction, and the leading lights and beacons on Flying Fish Point have been moved to indicate the course in, which is now N. W. by W. 3/4 W., while formerly it was W. 3/4 N. The houses at the pilot station and the pilot cutter are in good order.


CAIRNS.

The new cutting into Cairns harbour was completed last year, giving a depth of 13 feet at low water, spring tides, and leading lights and beacons have been established to render the cutting easily navigable by night as well as by day. The dredged channel has stood remarkably well; only a slight silting up has been recently reported near the third pile. This spot, however—upon inquiry—appears never to have been dredged. A new staff for the outer leading light has been erected, and the buoys and beacons are fully maintained. The largest coasting steamers now enter and leave the port in safety. The beacons in the Barron and Mulgrave Rivers are attended to by the staff at Cairns, and are at present in their proper positions.

My predecessor suggested that a lightship should be placed near the Fairway Buoy to mark the entrance to the dredged cutting, and as a guide for vessels visiting the port, as well as to exhibit the necessary tidal signals. A light-vessel or—what would be cheaper—a small fixed pile-light on the Trotter-Lindberg principle—would certainly be a great advantage. The pilot boat, dwelling-houses, boatshed, and all property of the Department is well looked after.


LOW ISLAND LIGHTHOUSE.

The lighthouse and buildings on this island are kept in a very orderly way, and apparently no outlay will be necessary for some time. The Harbour Master at Port Douglas visits the station once a month.


PORT DOUGLAS.

The buoys and beacons are in good order, but the lighthouse requires a new balcony and door. The buoys and beacons at the Daintree and Mossman Rivers are maintained by the staff at Port Douglas, but the trade at the present time is very limited.


COOKTOWN.

During the past year the swinging basin has been dredged, which considerably increases the anchorage accommodation at this port. The pilot vessel "Governor Cairns" has been recently repaired and remetalled, and consequently will require no further outlay for some time. She is principally employed in attending to the beacons in the Inner Route to Torres Straits, and conveying stores to the lighthouses at Archer Point and Rocky Islet. The harbour plant, buildings, buoys, beacons, and the lighthouse and signal station on Grassy Hill are well cared for, and in good order. Two new buoys were supplied last year.


LIGHTSHIPS.

The new relieving light-vessel is now stationed at Channel Rock, and, as she was provided with a new and complete equipment, no outlay will be necessary for her maintenance for some time.

The Claremont Island lightship had a thorough overhaul two years ago. She is kept in excellent order, and requires no outlay. The Piper Island lightship will be the next vessel to be relieved. The metal on her bottom is becoming thin, and the caulking in her topsides defective. After a careful examination I consider she may remain another year or eighteen months at her station. The repairs necessary in the meantime are unimportant.


BEACONS, INNER ROUTE.

These are now in an efficient state, the heavy weather of the pant year having occasioned considerable damage, two expensive beacons having to be renewed altogether.


THURSDAY ISLAND.

The timber portion of the jetty was finished last year, and the T end is now being slowly proceeded with, the velocity of the tide rendering the performance of the work very difficult. When complete it will be a great convenience to large steamers, not exceeding 22 feet draught of water, which will be able to lie alongside. The buoys and beacons are well maintained, but there are at present no leading lights for guiding vessels into the port at night-time. This want is often a source of great detention and loss to vessels visiting the port, and many complaints have been made in consequence. Arrangements can easily be made to provide leading lights; and as their maintenance would not require any addition to the present staff, the outlay would be very moderate. The lighthouse and signal station at Goode Island are in a very efficient state, but the tramway for getting oil and stores from the beach (some 1,100 feet in length) is quite past repair, and requires renewal. It is proposed to put iron instead of wooden rails, as being more economical in the end.

At the pilot station everything is in order, no outlay for repairs being necessary. The pilot cutter "Lizzie Jardine" has been relieved by the cutter "Eileen," recently repaired at Cooktown.


PROUDFOOT SHOAL LIGHTSHIP.

When I visited this vessel I found that the heavy weather experienced during the last north-west monsoon had caused her to ride heavily, and that her decks forward had, as a consequence, strained a little. The necessary repairs are being effected by one of the crew, who is a practical shipwright. I propose in future to keep a carpenter in lieu of a seaman on each light-vessel.


NORMANTON.

The dredged cuttings at the mouth of the Norman were completed on 20th September, 1890, when the necessary beacons and leading lights were erected, and all the works of the Department were in good order until the 24th February last, when the Gulf of Carpentaria was visited by a gale of great violence, accompanied by unusually high seas. Vessels anchored at the Norman Bar dragged considerably, although riding with both anchors down. The damage to the harbour works was very great. All the beacons at the mouths of the Norman and Albert Rivers were displaced, some being destroyed altogether. The lightship parted her cable, and was carried about 900 feet above ordinary high-water mark on the Bynoe beach, and two of the Department's boats were smashed. The dredged cuttings into the Norman River have stood very well, considering the gales and floods experienced during the year, for, except at one place near the second black buoy in the outer cutting, hardly any change is perceptible. At the place indicated, however, the channel for about 400 feet has silted up some 18 inches. Since the weather has become settled no further alteration has taken place. The buoys and beacons have been restored to a state of efficiency, but the lightship is still on shore. As she does not appear to have received much damage, a contract has been let for floating and taking her to Karumba.

After the "Vigilant" returned to Normanton from Thursday Island, where she had been relieving the "Albatross," she required a number of repairs which were executed, and she is now in fair condition.


GENERAL.

The trade to several of the ports having considerably diminished, I have as vacancies occurred, been able to recommend reductions in the staff by 13 officers and men, which will effect an annual saving of £1,932, without in any way impairing the efficiency of the Department.

Having visited all the lighthouses on the Queensland coast, I find the sites upon which the structures are erected have been selected with great care and judgment, and the illuminating apparatus of the most modern description (excepting Cape Moreton, which, however, shows an excellent light), and supplied principally by the eminent lighthouse engineers, Messrs. Chance Bros., of Birmingham.

Additional 1st or 2nd order lights are not necessary at present, but in the Inner Route and Torres Strait much time is lost by the mail and other large steamers through having to anchor at night. Steam vessels are fast superseding sailing vessels, and their number passing along this coast increases every month, which will soon render additional lights necessary.

Pintsch's gas for beacons, buoys, and light-vessels is being adopted to a great extent in Europe, Asia, America, and the Suez Canal. In the colony of Victoria Pintsch's gas buoys are also in use. It possesses great advantages, owing to the cheapness of first cost and to the fact that no outlay is necessary for lightkeepers, as the light burns from six weeks to two months without attention. This system of lighting is admirably adapted for use in the Inner Route and for the shifting channels at the entrance to Moreton Bay. Several lightships with their crews have been recently dispensed with in France, and gas buoys substituted.

Another cheap and very effective light, the "Trotter Lindberg," is being introduced into the lighting system of Europe. This light is produced by burning paraffin or lythene oil in a specially designed apparatus. With the latter the light burns 14 days, and with the former 7 days without attention. A special feature of the apparatus is that an intermittent light is produced by the automatic action of a screen, which is made to revolve by the ascent of the heated air produced by the light. To mark the outer end of a cutting or narrow channel, the Trotter-Lindberg light might be utilised instead of a lightship. A lantern, with optical apparatus complete, costs about £100 to £125 in London.


SUNKEN WRECKS.

Disfigure several of our rivers, and are not only a source of danger to navigation, but are liable to cause deposits which may hereafter render dredging necessary. I have endeavoured—without success—to find owners for the vessels referred to. Ownership has evidently been transferred from one to another with the intention of evading the responsibility of raising or removing the wrecks. Some legislation is needed on this subject. The steamer "Settler" was removed from the river bank at Bulimba in February last, the lowest tender for the work being £100.


WRECKS AND CASUALTIES.

A tabulated statement is attached hereto, giving particulars of the wrecks and casualties to shipping on our coast for the year ending 30th June last. Happily no loss of life has been the result. Nor have the crews suffered much hardship, being in most cases rescued by means of their own boats.


WATER POLICE.

Good work has been done by the Town Water Police, all their vigilance being required to prevent breaches of the Port Regulations.


UNIVERSAL SYSTEM, BUOYS AND BEACONS.

The system as recommended by the International Maritime Conference at Washington, the Life-saving Appliances Act, the new Load Line Act, and the Report of the Bulkhead Committee are having the special attention of the Marine Board, and will be dealt with as soon as possible.


TREE-PLANTING ON ISLANDS AND REEFS.

The pilot vessels at Broadsound, Mackay, Townsville, and Cooktown have been frequently utilised during the last twelve months in conveying cocoanut and other trees, to the various islands and reefs adjacent to our coast, where they have been planted, and the lightkeepers in the neighbourhood have been instructed to protect the young plants as far as possible. Tree culture, especially the cocoanut—for which the coral islands form congenial homes—is important, not only commercially, but as contributing to the safety of navigation, the existence of trees rendering the outlying islands and reefs more conspicuous, and are more serviceable than beacons. As an article of food, the cocoanuts would prove invaluable to shipwrecked crews. Those planted on some of the islands are thriving well, especially some 200 young plants on the Lizard Islands. The trees that have been planted recently require protection in some way, or they will disappear, as did the fully-matured trees which existed some years ago on the Frankland Islands.


FISHERIES.

The revenue derived from the Oyster Fisheries has increased in a substantial manner during the past year. This is owing to the large number of banks which have been licensed in Rodd's Harbour, and also the successful sale of dredge sections in Moreton Bay. Banks at the Flinders Group, Princess Charlotte Bay, have also been licensed, the oysters being sent to Normanton and Burketown. On my recent Northern trip I visited Flinders Group, and saw indications of what may develop into a large industry, not only in connection with edible oysters, but with pearl oysters, several samples of which were shown to me. The quantity and value of oysters exported from Brisbane and Maryborough up to 30th June last were as per following table, viz.:—

BRISBANE.

YearNo. of Bags.Value.(£)
187045231644
187151271625
187240601427
187330360,768
187439121704
187553492622
187666482792
187727361639
187817901227
187937932729
188052933475
188175596153
188299539074
188388787342
188482568475
188580768094
188675128533
188771678240
188861917616
1899679113368
18901290615981
1891[A]871911381

MARYBOROUGH.

YearNo. of Bags. Value. (£)
18871,6921,967
18881,9903,326
18891,9143,677
18903,2576,580
1891[A]1,8693,542

[A] six months


The revenue received on account of Oyster Fisheries for the year ending 30th June, 1981, was as follows:—

Brisbane£4,360179
Maryborough875100
Gladstone40000
Rockhampton200
Thursday Island (Flinders Group)700
Total£5,64579

The number of men and boats employed in connection with the oyster industry in Moreton Bay are—men 82, boats 36; and the number of banks worked are 241.

Licenses for catching fish at this port have been issued as follows for the current year:—Europeans, 99 men and 46 boats; Chinese, 32 men and 16 boats.

Attached hereto is the Inspector's Report on the Oyster and other Fisheries in the Maryborough district.

I have, &c.,
T. M. ALMOND,
Portmaster and Chairman Marine Board.


Casualties to Vessels on the Queensland Coast for the year ended 30th June, 1891.

Name of Vessel.Tonnage.Date.Nature and Locality of Casualty.Total or Partial Loss.No. of Lives Lost.Result of Inquiry.
Taldora, s.s.23214 July 1890Stranding, Eagle Rock, Fitzroy River Partial None Master cautioned.
Archer, s.s.69420 July 1890Stranding, M Reef, Inner Route Partial None Pilot's license suspended 3 months.
Changsha, s.s.146322 July 1890Stranding, Rattray Island, Inner Route Partial None Master severely censured.
Volga, barque162006 August 1890Stranding, Beresford Shoal Total None No default.
Grace Lynn, schr.9312 August 1890Stranding, reef off Low Island Partial None Master Guilty; gross negligence.
Joseph, barque68722 August 1890Stranding, Heroine Reef, Endeavour Strait Total None Foreign vessel. No inquiry.
Royal Duke, schr.10522 August 1890Foundering, Cooktown Harbour Partial None No default.
Jennie Scott, ketch3821 September 1890Stranding, Flora Reef Total None No default.
Taiyuan, s.s.226914 October 1890Collision, Brisbane River Partial None Pilot's license suspended for 3 months.
Corea, s.s.38209 November 1890Fire, Brisbane River Partial None No default.
Kate, s.s.14711 November 1890Collision, Brisbane Bar Total None Insufficient lookout on Burwah.
Burwah, s.s.56811 November 1890Collision, Brisbane Bar Partial None Insufficient lookout on Burwah.
Maori King, s.s.247608 December 1890Stranding, Brisbane River Partial None No default.
Orange Grove, barque38515 December 1890Stranding, Dungeness Partial None No default.
Fiado, s.s.98518 December 1890Stranding, Brisbane River Partial None No default.
Sybil, schr.15007 January 1891Dismasting off Double Island Point Partial None No default.
Perseverance, schr.16308 January 1891Foundering 18 miles from High Peak Point Total None Master's certificates cancelled.
Wawoon, s.s.5008 January 1891Damage to boiler, Fitzroy River Partial None Engineer's certificate suspended 3 months.
Kingswear, s.s.20105 February 1891Stranding, Cordelia Rock Partial None Master cautioned.
Recorder, s.s.67706 February 1891Stranding, Madge Reef, Normanby Sound Partial None No default.
Moltke, barque82721 May 1891Stranding, Flinders Opening Partial None Foreign vessel. No inquiry.
Wastwater, s.s281010 June 1891Collision, Brisbane River No Loss None Master Ranelagh cautioned.
Ranelagh, s.s.83610 June 1891Collision, Brisbane River No Loss None Master Ranelagh cautioned.
Anahuac, ship122015 June 1891Stranding, reef near Bramble Cay Total None Foreign vessel. No inquiry.



Harbour Master's Office,
Maryborough, 31st July, 1891.


Sir,—In accordance with your instructions, I have the honour to submit the following Report on the Oyster Fisheries of this port, the extreme limits of which extend from Tin Can Inlet on the south, taking in Wide Bay, Great Sandy Strait, and Hervey Bay, to the Burrum River on the north, covering a distance of nearly 100 miles, exclusive of many large creeks, all containing oyster ground between those limits.

I commenced marking off these oyster banks in July, 1886. We then had licenses issued for 72 banks, 18 boats, and 42 men, at a revenue of £398 for the year ending 30th June, 1886. We now have for the year ending 30th June, 1891, licenses issued for 175 oyster banks, 30 boats, and 53 men, at a revenue of £942 2s. 6d. [Vide Schedule appended.]

I hope to have the survey of the different sections in Hervey Bay completed by the end of the present year, when tracings of plans of same will be forwarded to you. This would have been finished before, but that I can only spare a few days in each month from my other duties for the work. I shall then require to run over the whole district again, as a considerable quantity of new ground has been taken up in the different sections since first survey, owing to the heavy falls of spat which have since taken place, portions of which ground previously never carried an oyster. During the past year large quantities of spat have fallen on the oyster banks in Hervey Bay and Great Sandy Strait, some of the banks being literally covered, thus preventing the shipment of good marketable oysters, which, if removed in their present state, would cause the destruction of all the young oysters attached to them.

Great attention has been paid by the different licensees to the cultivation of their banks by removing the poor oysters from the high ridges, after being carefully culled and separated into clumps containing from three to four oysters, are deposited on the grass flat and lower ground lying near. Upwards of 4,000 bags have been treated in this manner with excellent results.

Over 9,000 bags of marketable oysters, at a rough value of 30s. per bag (£13,500), have been shipped during the past year by the different licensees to the various markets of the colonies. Messrs. Leftwich and Sons alone have sent over 3,500 bags; the Moreton Bay Oyster Company and Messrs. Perry and Griffin have also shipped large quantities of oysters for the purpose of cultivating the Moreton Bay banks.

In conclusion, I am pleased to state that the whole business throughout is in a flourishing condition and steadily increasing in magnitude, and I feel confident that the revenue received from this industry for the following year will reach four figures.


FISHERIES.

There have been large quantities of mullet in this district during the season which commences when the westerly winds set in, generally about the end of May and ending about August, when they come close in to the shore to spawn. Crabs are also plentiful.

I do not think that a close season is at all necessary at this port, as there are so few persons engaged in the traffic.

Licenses have been issued at this port for the year ending 30th June, 1891, to 6 Europeans and 4 Chinese; also 6 boats.


I have, &c.,
EDWD. J. BOULT,
Inspector of Fisheries.

The Chairman, Marine Board, Brisbane.


Schedule respecting Oyster Fisheries, Maryborough.

Period.Banks.Boats.Men.Revenue.
Year ending June, 1886721840398 0 0
Year ending June, 18871403070765 0 0
Year ending June, 18881504073836 0 0
Year ending June, 18891673777923 0 0
Year ending June, 18901633351903 0 0
Year ending June, 18911753153949 2 6

Transfers and Fishing Licenses. £12.


Price 1s. 6d.

By Authority: James C. Beal, Government Printer, William street, Brisbane.


Map of Moreton Bay. Tracing from survey of 1891. 3 & 5 fathom contours in red were those of 1886.





End of the Project Gutenberg EBook of Report on the Department of Ports and
Harbours for the Year 1890-1981, by Department of Ports and Harbours

*** END OF THIS PROJECT GUTENBERG EBOOK REPORT 1890-1891 ***

***** This file should be named 24442-h.htm or 24442-h.zip *****
This and all associated files of various formats will be found in:
        http://www.gutenberg.org/2/4/4/4/24442/

Produced by Nick Wall, Brisbane, Australia. <nick0252@live.com.au>

Updated editions will replace the previous one--the old editions
will be renamed.

Creating the works from public domain print editions means that no
one owns a United States copyright in these works, so the Foundation
(and you!) can copy and distribute it in the United States without
permission and without paying copyright royalties.  Special rules,
set forth in the General Terms of Use part of this license, apply to
copying and distributing Project Gutenberg-tm electronic works to
protect the PROJECT GUTENBERG-tm concept and trademark.  Project
Gutenberg is a registered trademark, and may not be used if you
charge for the eBooks, unless you receive specific permission.  If you
do not charge anything for copies of this eBook, complying with the
rules is very easy.  You may use this eBook for nearly any purpose
such as creation of derivative works, reports, performances and
research.  They may be modified and printed and given away--you may do
practically ANYTHING with public domain eBooks.  Redistribution is
subject to the trademark license, especially commercial
redistribution.



*** START: FULL LICENSE ***

THE FULL PROJECT GUTENBERG LICENSE
PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK

To protect the Project Gutenberg-tm mission of promoting the free
distribution of electronic works, by using or distributing this work
(or any other work associated in any way with the phrase "Project
Gutenberg"), you agree to comply with all the terms of the Full Project
Gutenberg-tm License (available with this file or online at
http://gutenberg.org/license).


Section 1.  General Terms of Use and Redistributing Project Gutenberg-tm
electronic works

1.A.  By reading or using any part of this Project Gutenberg-tm
electronic work, you indicate that you have read, understand, agree to
and accept all the terms of this license and intellectual property
(trademark/copyright) agreement.  If you do not agree to abide by all
the terms of this agreement, you must cease using and return or destroy
all copies of Project Gutenberg-tm electronic works in your possession.
If you paid a fee for obtaining a copy of or access to a Project
Gutenberg-tm electronic work and you do not agree to be bound by the
terms of this agreement, you may obtain a refund from the person or
entity to whom you paid the fee as set forth in paragraph 1.E.8.

1.B.  "Project Gutenberg" is a registered trademark.  It may only be
used on or associated in any way with an electronic work by people who
agree to be bound by the terms of this agreement.  There are a few
things that you can do with most Project Gutenberg-tm electronic works
even without complying with the full terms of this agreement.  See
paragraph 1.C below.  There are a lot of things you can do with Project
Gutenberg-tm electronic works if you follow the terms of this agreement
and help preserve free future access to Project Gutenberg-tm electronic
works.  See paragraph 1.E below.

1.C.  The Project Gutenberg Literary Archive Foundation ("the Foundation"
or PGLAF), owns a compilation copyright in the collection of Project
Gutenberg-tm electronic works.  Nearly all the individual works in the
collection are in the public domain in the United States.  If an
individual work is in the public domain in the United States and you are
located in the United States, we do not claim a right to prevent you from
copying, distributing, performing, displaying or creating derivative
works based on the work as long as all references to Project Gutenberg
are removed.  Of course, we hope that you will support the Project
Gutenberg-tm mission of promoting free access to electronic works by
freely sharing Project Gutenberg-tm works in compliance with the terms of
this agreement for keeping the Project Gutenberg-tm name associated with
the work.  You can easily comply with the terms of this agreement by
keeping this work in the same format with its attached full Project
Gutenberg-tm License when you share it without charge with others.

1.D.  The copyright laws of the place where you are located also govern
what you can do with this work.  Copyright laws in most countries are in
a constant state of change.  If you are outside the United States, check
the laws of your country in addition to the terms of this agreement
before downloading, copying, displaying, performing, distributing or
creating derivative works based on this work or any other Project
Gutenberg-tm work.  The Foundation makes no representations concerning
the copyright status of any work in any country outside the United
States.

1.E.  Unless you have removed all references to Project Gutenberg:

1.E.1.  The following sentence, with active links to, or other immediate
access to, the full Project Gutenberg-tm License must appear prominently
whenever any copy of a Project Gutenberg-tm work (any work on which the
phrase "Project Gutenberg" appears, or with which the phrase "Project
Gutenberg" is associated) is accessed, displayed, performed, viewed,
copied or distributed:

This eBook is for the use of anyone anywhere at no cost and with
almost no restrictions whatsoever.  You may copy it, give it away or
re-use it under the terms of the Project Gutenberg License included
with this eBook or online at www.gutenberg.org

1.E.2.  If an individual Project Gutenberg-tm electronic work is derived
from the public domain (does not contain a notice indicating that it is
posted with permission of the copyright holder), the work can be copied
and distributed to anyone in the United States without paying any fees
or charges.  If you are redistributing or providing access to a work
with the phrase "Project Gutenberg" associated with or appearing on the
work, you must comply either with the requirements of paragraphs 1.E.1
through 1.E.7 or obtain permission for the use of the work and the
Project Gutenberg-tm trademark as set forth in paragraphs 1.E.8 or
1.E.9.

1.E.3.  If an individual Project Gutenberg-tm electronic work is posted
with the permission of the copyright holder, your use and distribution
must comply with both paragraphs 1.E.1 through 1.E.7 and any additional
terms imposed by the copyright holder.  Additional terms will be linked
to the Project Gutenberg-tm License for all works posted with the
permission of the copyright holder found at the beginning of this work.

1.E.4.  Do not unlink or detach or remove the full Project Gutenberg-tm
License terms from this work, or any files containing a part of this
work or any other work associated with Project Gutenberg-tm.

1.E.5.  Do not copy, display, perform, distribute or redistribute this
electronic work, or any part of this electronic work, without
prominently displaying the sentence set forth in paragraph 1.E.1 with
active links or immediate access to the full terms of the Project
Gutenberg-tm License.

1.E.6.  You may convert to and distribute this work in any binary,
compressed, marked up, nonproprietary or proprietary form, including any
word processing or hypertext form.  However, if you provide access to or
distribute copies of a Project Gutenberg-tm work in a format other than
"Plain Vanilla ASCII" or other format used in the official version
posted on the official Project Gutenberg-tm web site (www.gutenberg.org),
you must, at no additional cost, fee or expense to the user, provide a
copy, a means of exporting a copy, or a means of obtaining a copy upon
request, of the work in its original "Plain Vanilla ASCII" or other
form.  Any alternate format must include the full Project Gutenberg-tm
License as specified in paragraph 1.E.1.

1.E.7.  Do not charge a fee for access to, viewing, displaying,
performing, copying or distributing any Project Gutenberg-tm works
unless you comply with paragraph 1.E.8 or 1.E.9.

1.E.8.  You may charge a reasonable fee for copies of or providing
access to or distributing Project Gutenberg-tm electronic works provided
that

- You pay a royalty fee of 20% of the gross profits you derive from
     the use of Project Gutenberg-tm works calculated using the method
     you already use to calculate your applicable taxes.  The fee is
     owed to the owner of the Project Gutenberg-tm trademark, but he
     has agreed to donate royalties under this paragraph to the
     Project Gutenberg Literary Archive Foundation.  Royalty payments
     must be paid within 60 days following each date on which you
     prepare (or are legally required to prepare) your periodic tax
     returns.  Royalty payments should be clearly marked as such and
     sent to the Project Gutenberg Literary Archive Foundation at the
     address specified in Section 4, "Information about donations to
     the Project Gutenberg Literary Archive Foundation."

- You provide a full refund of any money paid by a user who notifies
     you in writing (or by e-mail) within 30 days of receipt that s/he
     does not agree to the terms of the full Project Gutenberg-tm
     License.  You must require such a user to return or
     destroy all copies of the works possessed in a physical medium
     and discontinue all use of and all access to other copies of
     Project Gutenberg-tm works.

- You provide, in accordance with paragraph 1.F.3, a full refund of any
     money paid for a work or a replacement copy, if a defect in the
     electronic work is discovered and reported to you within 90 days
     of receipt of the work.

- You comply with all other terms of this agreement for free
     distribution of Project Gutenberg-tm works.

1.E.9.  If you wish to charge a fee or distribute a Project Gutenberg-tm
electronic work or group of works on different terms than are set
forth in this agreement, you must obtain permission in writing from
both the Project Gutenberg Literary Archive Foundation and Michael
Hart, the owner of the Project Gutenberg-tm trademark.  Contact the
Foundation as set forth in Section 3 below.

1.F.

1.F.1.  Project Gutenberg volunteers and employees expend considerable
effort to identify, do copyright research on, transcribe and proofread
public domain works in creating the Project Gutenberg-tm
collection.  Despite these efforts, Project Gutenberg-tm electronic
works, and the medium on which they may be stored, may contain
"Defects," such as, but not limited to, incomplete, inaccurate or
corrupt data, transcription errors, a copyright or other intellectual
property infringement, a defective or damaged disk or other medium, a
computer virus, or computer codes that damage or cannot be read by
your equipment.

1.F.2.  LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the "Right
of Replacement or Refund" described in paragraph 1.F.3, the Project
Gutenberg Literary Archive Foundation, the owner of the Project
Gutenberg-tm trademark, and any other party distributing a Project
Gutenberg-tm electronic work under this agreement, disclaim all
liability to you for damages, costs and expenses, including legal
fees.  YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT
LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
PROVIDED IN PARAGRAPH F3.  YOU AGREE THAT THE FOUNDATION, THE
TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE
LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR
INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
DAMAGE.

1.F.3.  LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a
defect in this electronic work within 90 days of receiving it, you can
receive a refund of the money (if any) you paid for it by sending a
written explanation to the person you received the work from.  If you
received the work on a physical medium, you must return the medium with
your written explanation.  The person or entity that provided you with
the defective work may elect to provide a replacement copy in lieu of a
refund.  If you received the work electronically, the person or entity
providing it to you may choose to give you a second opportunity to
receive the work electronically in lieu of a refund.  If the second copy
is also defective, you may demand a refund in writing without further
opportunities to fix the problem.

1.F.4.  Except for the limited right of replacement or refund set forth
in paragraph 1.F.3, this work is provided to you 'AS-IS' WITH NO OTHER
WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO
WARRANTIES OF MERCHANTIBILITY OR FITNESS FOR ANY PURPOSE.

1.F.5.  Some states do not allow disclaimers of certain implied
warranties or the exclusion or limitation of certain types of damages.
If any disclaimer or limitation set forth in this agreement violates the
law of the state applicable to this agreement, the agreement shall be
interpreted to make the maximum disclaimer or limitation permitted by
the applicable state law.  The invalidity or unenforceability of any
provision of this agreement shall not void the remaining provisions.

1.F.6.  INDEMNITY - You agree to indemnify and hold the Foundation, the
trademark owner, any agent or employee of the Foundation, anyone
providing copies of Project Gutenberg-tm electronic works in accordance
with this agreement, and any volunteers associated with the production,
promotion and distribution of Project Gutenberg-tm electronic works,
harmless from all liability, costs and expenses, including legal fees,
that arise directly or indirectly from any of the following which you do
or cause to occur: (a) distribution of this or any Project Gutenberg-tm
work, (b) alteration, modification, or additions or deletions to any
Project Gutenberg-tm work, and (c) any Defect you cause.


Section  2.  Information about the Mission of Project Gutenberg-tm

Project Gutenberg-tm is synonymous with the free distribution of
electronic works in formats readable by the widest variety of computers
including obsolete, old, middle-aged and new computers.  It exists
because of the efforts of hundreds of volunteers and donations from
people in all walks of life.

Volunteers and financial support to provide volunteers with the
assistance they need, is critical to reaching Project Gutenberg-tm's
goals and ensuring that the Project Gutenberg-tm collection will
remain freely available for generations to come.  In 2001, the Project
Gutenberg Literary Archive Foundation was created to provide a secure
and permanent future for Project Gutenberg-tm and future generations.
To learn more about the Project Gutenberg Literary Archive Foundation
and how your efforts and donations can help, see Sections 3 and 4
and the Foundation web page at http://www.pglaf.org.


Section 3.  Information about the Project Gutenberg Literary Archive
Foundation

The Project Gutenberg Literary Archive Foundation is a non profit
501(c)(3) educational corporation organized under the laws of the
state of Mississippi and granted tax exempt status by the Internal
Revenue Service.  The Foundation's EIN or federal tax identification
number is 64-6221541.  Its 501(c)(3) letter is posted at
http://pglaf.org/fundraising.  Contributions to the Project Gutenberg
Literary Archive Foundation are tax deductible to the full extent
permitted by U.S. federal laws and your state's laws.

The Foundation's principal office is located at 4557 Melan Dr. S.
Fairbanks, AK, 99712., but its volunteers and employees are scattered
throughout numerous locations.  Its business office is located at
809 North 1500 West, Salt Lake City, UT 84116, (801) 596-1887, email
business@pglaf.org.  Email contact links and up to date contact
information can be found at the Foundation's web site and official
page at http://pglaf.org

For additional contact information:
     Dr. Gregory B. Newby
     Chief Executive and Director
     gbnewby@pglaf.org


Section 4.  Information about Donations to the Project Gutenberg
Literary Archive Foundation

Project Gutenberg-tm depends upon and cannot survive without wide
spread public support and donations to carry out its mission of
increasing the number of public domain and licensed works that can be
freely distributed in machine readable form accessible by the widest
array of equipment including outdated equipment.  Many small donations
($1 to $5,000) are particularly important to maintaining tax exempt
status with the IRS.

The Foundation is committed to complying with the laws regulating
charities and charitable donations in all 50 states of the United
States.  Compliance requirements are not uniform and it takes a
considerable effort, much paperwork and many fees to meet and keep up
with these requirements.  We do not solicit donations in locations
where we have not received written confirmation of compliance.  To
SEND DONATIONS or determine the status of compliance for any
particular state visit http://pglaf.org

While we cannot and do not solicit contributions from states where we
have not met the solicitation requirements, we know of no prohibition
against accepting unsolicited donations from donors in such states who
approach us with offers to donate.

International donations are gratefully accepted, but we cannot make
any statements concerning tax treatment of donations received from
outside the United States.  U.S. laws alone swamp our small staff.

Please check the Project Gutenberg Web pages for current donation
methods and addresses.  Donations are accepted in a number of other
ways including checks, online payments and credit card donations.
To donate, please visit: http://pglaf.org/donate


Section 5.  General Information About Project Gutenberg-tm electronic
works.

Professor Michael S. Hart is the originator of the Project Gutenberg-tm
concept of a library of electronic works that could be freely shared
with anyone.  For thirty years, he produced and distributed Project
Gutenberg-tm eBooks with only a loose network of volunteer support.


Project Gutenberg-tm eBooks are often created from several printed
editions, all of which are confirmed as Public Domain in the U.S.
unless a copyright notice is included.  Thus, we do not necessarily
keep eBooks in compliance with any particular paper edition.


Most people start at our Web site which has the main PG search facility:

     http://www.gutenberg.org

This Web site includes information about Project Gutenberg-tm,
including how to make donations to the Project Gutenberg Literary
Archive Foundation, how to help produce our new eBooks, and how to
subscribe to our email newsletter to hear about new eBooks.